Hiking Project Logo

A historic rail to trails between two towns.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

10.4

Miles

16.8

KM

Point to Point

1,100' 335 m

High

975' 297 m

Low

479' 146 m

Up

506' 154 m

Down

2%

Avg Grade (1°)

7%

Max Grade (4°)

Dogs Leashed

Features Historical Significance

ADA Accessible Paved, ADA parking

Family Friendly The two main parking areas have playgrounds and picnic benches. Train engine and classic railway station in Pickens may capture the imagination of family members.

Need to Know

Parking, restrooms, and bike tools at Western end (409 East Cedar Rock Street, Pickens) and near the Eastern end (514 Fleetwood Drive, Easely) One can also start from downtown Easely where there is ample parking.

Description

The Doodle Trail is a multi-use rail to trail that connects Easely and Pickens. It is entirely paved so a nice choice when other routes are muddy.

Flora & Fauna

The ends run through the towns, so is suburban. The middle section runs through a forested region and pastures with live stock.

Shared By:

Christopher Rorden

Trail Ratings

  4.0 from 1 vote

#1

in Pickens

#23045

Overall
  4.0 from 1 vote
5 Star
0%
4 Star
100%
3 Star
0%
2 Star
0%
1 Star
0%
Trail Rankings

#1

in Pickens

#151

in South Carolina

#23,045

Overall
0 Views Last Month
0 Since Feb 25, 2024
Easy Easy

100%
0%
0%
0%
0%
0%

Photos

Easley parking lot with bike tools, water, accessibility and bath rooms (cleverly built into freight cars).
Feb 25, 2024 near Easley, SC
Pickens parking, restroom and diesel freight locomotive.
Feb 25, 2024 near Pickens, SC
Historical marker at the Pickens end.
Feb 25, 2024 near Pickens, SC

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

none
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.