Hiking Project Logo

This trail connects the Fishkill Ridge Trail and the Wilkinson Memorial Trail.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

0.4

Miles

0.6

KM

Point to Point

1,350' 411 m

High

1,235' 376 m

Low

115' 35 m

Up

27' 8 m

Down

7%

Avg Grade (4°)

13%

Max Grade (8°)

Dogs Leashed

Features Fall Colors · Views · Wildlife

Description

This is a short trail of about a half mile. The trail is identified by blue markers and the trail could be difficult to follow at times as it winds through a very shaded area of the forest.

The trail connects the Fishkill Ridge Trail and the Wilkinson Memorial Trail and only done as part of a loop. The trail is referred to as the Dozer Trail because an old abandoned bulldozer at the junction with the Fishkill Ridge Trail.

Contacts

Shared By:

John Maurizi

Trail Ratings

  3.0 from 1 vote

#31715

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Trail Rankings

#926

in New York

#31,715

Overall
7 Views Last Month
267 Since Jul 11, 2017
Easy/Intermediate Easy/Intermediate

50%
0%
50%
0%
0%
0%

Photos

Old bulldozer at the junction with the Fishkill Ridge Trail
Jul 19, 2017 near Beacon, NY
Start of Dozer Junction Trail
Jul 19, 2017 near Beacon, NY

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

May 26, 2019
Bernd Klug
0.4mi
Jul 29, 2017
Julia M
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.