Hiking Project Logo

Flowing, benched track following the true right of the Atiwhakatu River gradually up the valley.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

4.2

Miles

6.7

KM

Point to Point

1,811' 552 m

High

1,109' 338 m

Low

774' 236 m

Up

73' 22 m

Down

4%

Avg Grade (2°)

24%

Max Grade (13°)

Dogs Off-leash

Features Birding · River/Creek · Wildlife

Description

From the top of Donnelly Flat Loop, the Atiwhakatu Track gradually ascends the valley alongside the Atiwhakatu River (on it's true right). The trail is benched and graveled and easy to follow. The track offers a flatter alternate to the surrounding mountainous trails.

The track crosses many, many small tributaries and streams, using a mix of wood and steel bridges as well as occasional wire rope bridges.

The Atiwhakatu Hut greets you about 7 km after departing the Holdsworth carpark. At the hut, you can continue up the valley or climb steeply towards Mount Jumbo.

Contacts

Shared By:

Kerry Suter

Trail Ratings

  3.5 from 2 votes

#25782

Overall
  3.5 from 2 votes
5 Star
0%
4 Star
50%
3 Star
50%
2 Star
0%
1 Star
0%
Trail Rankings

#229

in New Zealand

#25,782

Overall
3 Views Last Month
386 Since Aug 7, 2016
Easy/Intermediate Easy/Intermediate

50%
0%
50%
0%
0%
0%

Photos

The longest of the wire rope bridges on the Atiwhakatu Trail.
Aug 7, 2016 near Masterton, NZ
Atiwhakatu Hut.
Aug 7, 2016 near Masterton, NZ
Wire Rope Bridge on the Atiwakatu Track.
Aug 7, 2016 near Masterton, NZ

0 Comments

Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

Aug 25, 2017
C Mayflower
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.