Hiking Project Logo

The connection trail for Platteville.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

3.0

Miles

4.9

KM

Point to Point

1,006' 307 m

High

871' 265 m

Low

147' 45 m

Up

12' 4 m

Down

1%

Avg Grade (1°)

9%

Max Grade (5°)

Dogs Leashed

Family Friendly Easy trail, rest stops, picnic areas.

Need to Know

The trail connects the community and businesses.

Description

The trail has a mixed surface; pavement, crush stone, hardpack, and dirt/grass. This trail connects all the other trails and paths in Platteville.

There are a few places to get on to the trail. At Memorial Park by the UW-Platteville campus, Delta 3 Engineering or Visitor's Center on HWY151, or behind Walmart on HWY151 as well. The Dog Park parking is mainly for dog park users. At the dog park, across Mineral Street, there is parking for trail users. Make sure to read the signs posted as it is shared parking with businesses and trail users. Parking symbols have been added where you can get on the path.

You'll see a lot of birds, squirrels, chipmunks, pasture with cows all along this trail. The trail is used by many people; walkers, runners, road bikers, and mountain bikers. Pets are allowed, just need to be leashed at all times.

There is one loop between Markee Ave and Reddy Dr. You'll be able to take either path. The lower one is off-road, dirt and grass. The upper is paved and meets again with the main trail.

Contacts

Shared By:

Josh Savoy

Trail Ratings

  4.0 from 1 vote

#2

in Platteville

#19386

Overall
  4.0 from 1 vote
5 Star
0%
4 Star
100%
3 Star
0%
2 Star
0%
1 Star
0%
Trail Rankings

#2

in Platteville

#196

in Wisconsin

#19,386

Overall
2 Views Last Month
74 Since Jul 31, 2019
Easy Easy

100%
0%
0%
0%
0%
0%

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

none
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.