Hiking Project Logo

The eastern segment of a smooth and rolling trail built in a modern and sustainable style.


Your Rating: Rating Rating Rating Rating Rating      
Your Difficulty:
Your Favorites: Add To-Do · Your List

3.4

Miles

5.5

KM

Point to Point

989' 301 m

High

819' 250 m

Low

211' 64 m

Up

57' 17 m

Down

1%

Avg Grade (1°)

7%

Max Grade (4°)

Dogs Unknown

This trail is open to both bikes and foot traffic. Please stay alert on the trails and respect other users.
Open 30 minutes before sunrise to 30 minutes after sunset. Closed when wet and seasonally after the last thaw until the trail surface dries and hardens.

Description

The trail is generally well marked and consists of 95+% smooth and generally flat singletrack through a young eastern forest. It can be started at the lower parking area. There are many stream crossings, most with bridges. There are also a couple of sections of boardwalk trail.

Continue straight onto the Red Trail when you intersect with this trail.

Go enjoy! It doesn't get much better than this in the Cleveland area.

Contacts

Land Manager: Cleveland MetroParks

Shared By:

ESG Greene

Trail Ratings

  4.8 from 5 votes

#2992

Overall
  4.8 from 5 votes
5 Star
80%
4 Star
20%
3 Star
0%
2 Star
0%
1 Star
0%
Trail Rankings

#38

in Ohio

#2,992

Overall
2 Views Last Month
420 Since Sep 29, 2017
Intermediate Intermediate

50%
0%
25%
0%
25%
0%

0 Comments

6,000 characters
6,000 characters

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

May 25, 2020
Joel Kolata
Mar 30, 2018
Shannon Coleman
PrevNext
May 2025
SuMoTuWeThFrSa
    123
45678910
11121314151617
18192021222324
25262728293031
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.